Recent Articles
NYISO exceeded its winter baseline peak load forecast on Feb. 7, its COO told the Management Committee.
The conversation during a five-hour meeting on changes to NYISO’s transmission planning processes became heated at times, as stakeholders challenged ISO officials on exactly how they will develop the possible scenarios they propose to determine reliability needs.
NYISO is proposing to use a set of multiple scenarios rather than relying on a single base case in its Reliability Planning Process to avoid study-by-study fluctuations in determining reliability needs.
The NYISO Operating Committee discussed the challenges it faced while successfully navigating through several events in January, including a major winter storm.
The average cost for electricity in NYISO was $201.89/MWh in January, up nearly 53% from January 2025 and possibly the highest ever for the month, the ISO reported.
Want more? Advanced Search






