ERCOT
ERCOT Board of DirectorsERCOT Other CommitteesERCOT Technical Advisory Committee (TAC)Public Utility Commission of Texas (PUCT)
The Electric Reliability Council of Texas manages the flow of electric power to about 90 percent of the state’s electric load. The nonprofit independent system operator is governed by a board of directors and is subject to oversight by the Public Utility Commission of Texas and the Texas Legislature.
Beth Garza’s annual visit to GCPA’s Houston chapter once again drew a roomful of observers hoping to glean insights into the ERCOT market.
NextEra Energy filed a federal lawsuit challenging a recent Texas law giving incumbent utilities a ROFR to build transmission projects in the state.
The Texas PUC approved a 345-kV transmission project that cuts through an active petroleum field in West Texas’ Permian Basin.
A tag team of ERCOT executives reviewed the grid operator’s summer preparations at the Board of Directors’ last meeting before the season begins.
The Texas PUC delayed action on a proposed transmission project in the Permian Basin, allowing parties to make modifications in the proposed order.
ERCOT in April set new monthly generation records for its wind and solar fleets, producing 7,148 GWh and 408 GWh, respectively.
The Texas Reliability Entity bested all other REs on NERC’s 2018 ERO effectiveness survey, the RE's Board of Directors heard.
ERCOT’s low reserve margin sticks out when compared to those of most other regions in the U.S., where their reserves are well above their reference levels.
The Texas Public Utility Commission gave its final blessing to a $1.37 billion transaction involving Oncor, Sharyland Utilities and Sempra Energy.
Attendees at a Mexican power market workshop discussed the woes wrought on the market since President Andrés Manuel López Obrador took over last year.
Want more? Advanced Search