January 8, 2025

load forecasting

MISO Nixes LSE Load Forecast Plan
MISO has called off a proposal to rely on data from its load-serving entities to compile its own long-term load forecast.
This graph from PJM shows how much of an impact on the load forecast in different transmission zone varying percentages of peak shaving would have.
Plan Would Reduce PJM Capacity Curve Through Peak Shaving
PJM hopes to reduce its capacity market demand curve by including peak shaving among the variables used to develop its load forecast.
PJM Operating Committee Briefs: June 5, 2018
PJM experienced 77 emergency procedures in May, staff told attendees at last week’s Operating Committee meeting.
ISO-NE
ISO-NE Planning Advisory Committee Briefs: April 26, 2018
ISO-NE's 10-year Capacity, Energy, Loads and Transmission (CELT) forecast predicts 2026 annual net load will be about 3.7% lower than estimated in the 2017 forecast.
MISO Markets Committee Talks Winter, Spring — and Beyond
A seasonal post-mortem at this month's MISO Board Week provided stakeholders with insight into the RTO’s market performance recently, in the near future and the long term.
© RTO Insider
Advisory Committee Steps up Criticism of MISO Forecast Plan
MISO Advisory Committee members criticized the RTO’s plan to revamp load forecasting using projections from load-serving entities.
Purdue University
Members Skeptical as MISO Explores LSE Load Forecasting
MISO is surveying how to get more information from load-serving entities to create a more detailed load forecast for transmission planning.
© RTO Insider
MISO Resource Adequacy Subcommittee Briefs: Feb. 7, 2018
Preliminary estimates show that MISO’s capacity requirements and available supply for the 2018/19 capacity auction will be in line with last year’s figures.
ISO-NE
Patriots Drive Unique Super Bowl Load Spikes
ISO-NE analyzed shifts in demand for electricity during Super Bowl LI, which saw the New England Patriots beat the Atlanta Falcons in overtime.
© RTO Insider
MISO Looks to Align Load Forecasting, Tx Planning
MISO is seeking to more closely harmonize its load forecasting process with the four 15-year future scenarios it creates for transmission planning.

Want more? Advanced Search