November 24, 2024
Stakeholder Soapbox: Replacing Indian Point A Tough Challenge
Rob DiFrancesco, of New York AREA, details the challenges the state will face after the Indian Point nuclear power plant shuts down in 2021.

By Rob DiFrancesco

The economic and environmental challenges of replacing Indian Point are formidable. So are the grid reliability challenges.

Any attempt to minimize these impacts is a disservice to New Yorkers who face, at best, an uncertain energy future due to rising prices, higher carbon and other toxic emissions, and lower grid reliability.

For more than 40 years, Indian Point has been the backbone of New York’s electricity system. It generates 2,069 MW of power, providing 25% of the electricity for New York City and the surrounding region. In fact, the plant generates enough power for 2 million New York homes and the same amount typically produced by four or five natural gas natural plants.

nyiso indian point nuclear plant
Indian Point

Except for scheduled refueling outages, it generates baseload power 90% of the time, with no emissions. Even though we have up to four years to replace Indian Point’s power, it is very difficult to get anything approved and built in New York, including renewable energy facilities, in such a relatively short period of time.

Price Pressures

Replacing the supply of Indian Point’s power to meet the growing demand for electricity in New York will not be easy. But it is not only the resulting supply gap that puts upward pressure on electric power prices.

Improvements in the transmission grid necessary to bring new power to New Yorkers will be enormously expensive. Such infrastructure investments are particularly necessary and costly if the power must be transported over long distances, or if there is greater reliance on intermittent renewable power sources.

Other power sources are also subject to sharp price fluctuations. During the hottest days of the summer and the coldest of the winter, it is difficult for New York to get sufficient amounts of out-of-state natural gas, which also drives up prices at these critical times.

Also, the massive amount of renewable energy power needed to replace Indian Point is daunting and simply not practical. Replacing 1,000 MW, less than half of Indian Point’s generation, with solar power requires 45 to 75 square miles of land and 260 to 360 square miles for wind power.[1] For perspective, Manhattan is only 22.8 square miles of land.

Emissions

Indian Point also generates tremendous amounts of electricity with nearly zero carbon or other toxic emissions. The other critical question is not if toxic emissions will increase when Indian Point closes, but by how much.

California, Florida, Wisconsin and Vermont have all experienced greater reliance on fossil fuels and very significant increases in pollution after closing nuclear power plants.[2]

In fact, when advocating for New York’s upstate nuclear plants, Chairman of Energy and Finance for New York Richard Kauffman said, “Without our upstate nuclear fleet, 31 million tons of CO2 would be released in just two years, the equivalent of adding 6 million cars to the road — resulting in an additional $1.4 billion in public health and other societal costs. New York would have to rely on more expensive and dirtier power.”[3]

Grid Reliability

New York is fortunate that Indian Point will be operating until 2021. In fact, were the plant to close today, the state’s grid would not be reliable, according to NYISO.[4]

The costs of blackouts are enormous. The New York City comptroller found that the 2003 blackout cost the city more than $1 billion in lost wages, spoiled food and other costs.[5]

Blackouts are also a danger to public health. Researchers from Johns Hopkins University also studied the 2003 blackout and documented that it resulted in 90 deaths.[6]

Looking beyond the societal and economic costs of daylong blackouts, having an unreliable grid will make New York a very unattractive place to do business, especially for companies that are high-intensity users of electricity, such as manufacturers and high-tech companies.

Looking Ahead

Plans by state policymakers to address the issues resulting from the early shutdown of Indian Point should be transparent and thoughtful. Input from affected communities and organized labor are a must. We must address both environmental and economic issues to minimize adverse impacts on the regional economy and the ecology. Believing that Indian Point’s power can simply be replaced by energy efficiency or an enormous increase in renewables is not realistic.

New York consumers and businesses need to brace for the impact that Indian Point’s closing will have and be fully and clearly informed of what the impact will be in terms of monthly electric utility bills, air quality, and grid reliability.

Rob DiFrancesco is the executive director of the New York Affordable Reliable Electricity Alliance (New York AREA), a diverse organization of major business, labor, and community groups including Entergy, the owner-operator of Indian Point. Founded in 2003, New York AREA’s mission is to ensure that New York has an ample and reliable electricity supply, and economic prosperity for years to come.

[1] Nuclear Energy Institute, “Land Requirements for Carbon-Free Technologies,” Analysis, June 2015. Information appears in a chart at the beginning of the document and is discussed throughout. Retrieved on March 14, 2017 https://www.nei.org/CorporateSite/media/filefolder/Policy/Papers/Land_Use_Carbon_Free_Technologies.pdf?ext=.pdf

[2] Nuclear Energy Institute, “Can California Cut Its Carbon Without Nuclear? Doubtful.” Analysis, June 30, 2016. Items appear in charts and are discussed throughout the text. Retrieved on March 13, 2017 https://www.nei.org/News-Media/News/News-Archives/Can-California-Cut-Its-Carbon-Without-Nuclear-Doub

[3] NY State of Politics, “Cuomo Energy Czar Blasts Anti-Nuke Subsidy Campaign,” News story with accompanying link to the letter from Richard Kauffman, October 5, 2016. Information appears in the fifth paragraph of the letter. Retrieved on March 10, 2017 http://www.nystateofpolitics.com/2016/10/cuomo-energy-czar-blasts-anti-nuke-subsidy-campaign/

[4] NYISO, “2016 Reliability Needs Assessment,” October 18, 2016. Page 11, “Indian Point Center Plant Retirement – Resource Adequacy”. Retrieved on March 27, 2017, http://www.nyiso.com/public/webdocs/markets_operations/services/planning/Planning_Studies/Reliability_Planning_Studies/Reliability_Assessment_Documents/2016RNA_Final_Oct18_2016.pdf

[5] USA Today/Associated Press, “Blackout cost estimated at up to $6 billion,” August 10, 2003. Information appears in the 13th paragraph. Retrieved on March 10, 2017 http://usatoday30.usatoday.com/news/nation/2003-08-19-blackout-cost_x.htm

[6] Reuters, “Spike in deaths blamed on 2003 New York blackout,” January 27, 2012. Information is summarized in the eighth paragraph and discussed throughout the article. Retrieved on March 13, 2017 http://www.reuters.com/article/us-blackout-newyork-idUSTRE80Q07G20120127

CommentaryNew YorkNuclear PowerNYISOResources

Leave a Reply

Your email address will not be published. Required fields are marked *