Energy Storage
The Connecticut Department of Energy and Environmental Protection released the final version of its biennial integrated resources plan.
Grid planners need more input on policy and a reliability “safety valve,” the Eastern Interconnection Planning Collaborative said in a new paper.
ISO-NE hosted a virtual public forum to discuss its draft 2021 Regional System Plan, with Sen. Angus King and NERC CEO Jim Robb speaking.
FERC on Tuesday approved MISO’s two-part plan to get hybrid resources accredited for participation in the RTO’s capacity auctions.
A Smart Energy Week panel said a decarbonized grid will need long-term storage "time machines" to move energy from when it's produced to when it's needed.
The actions needed to harden Vermont’s infrastructure against climate change likely will include utility upgrades such as microgrid projects and smart grid technologies.
A new initiative at DOE's national labs will use AI and machine learning to cut the time long-duration storage technologies will need to reach commercial scale.
The NYISO BIC recommended approval of tariff revisions to exempt solar generators no larger than 20 MW from meteorological data collection.
Reaching the goal of 24-7 carbon-free power will require a dramatic increase in storage to fill gaps in renewable output, large energy users say.
A key theme at the USEA forum was the push toward developing no- and low-carbon technologies that have applications beyond energy generation.
Want more? Advanced Search