balancing authority area control error limit (BAAL)
MISO said it experienced a “complete loss of monitoring or control capability” at its control center on March 1, setting off short-lived energy imbalances.
PJM's Operating Committee discussed rule changes regarding transmission scheduling, "max emergency" generation and retirement notices.
PJM stakeholders unanimously endorsed an issue charge that seeks to improve the deployment of synchronized reserves during a spin event.
The PJM Operating Committee endorsed changes to Manual 1 to expand the use of synchrophasors and make them a requirement for certain projects under the RTEP.
The winter of 2019/20 saw PJM with the lowest peak loads of the last seven years, as above-average temperatures kept energy consumption down.
PJM stakeholders endorsed changes to how generation ownership is transferred despite a concern about a required 45-day prefiling.
The PJM Operating Committee discussed the coming heavy outage season and the RTO's BAA control error limit, which remains lower than usual.
The PJM Operating Committee discussed how difficult power demand was to forecast in March as a snowstorm was followed by exceptionally warm weather.
Want more? Advanced Search