EDF Renewables

CAISO
CAISO Draft Tx Plan Includes $1.4B for Project Serving Silicon Valley Large Loads
CAISO’s draft 2025/26 transmission plan proposes more than $1 billion for an infrastructure project that would power new data centers and other large loads in Silicon Valley.
© RTO Insider 
Federal Volatility, MISO Tx Complaint Rattle Midcontinent Energy Summit
The tone of Infocast’s 2025 Midcontinent Energy Summit was noticeably apprehensive compared with last year, owing to political and regulatory uncertainty, load growth ambiguity, fluctuating tariffs and a pending complaint against MISO’s long-range transmission plan.
Shutterstock
PJM Presents Settlement on Site Control Requirements
PJM presented the Markets and Reliability Committee with a proposed settlement with several clean energy associations and developers on its site control requirements for new generation projects.

Want more? Advanced Search