November 27, 2024

ISO New England (ISO-NE)

Fletcher6, CC BY-SA-3.0, via Wikimedia
FERC Sets ROE for Exelon’s Mystic Plant at 9.33%
FERC set a base return on equity of 9.33% on the Mystic Generating Station’s reliability-must-run contract, using methodology it introduced last year.
National Institute of Standards and Technology
ISO-NE Presents Revised Market Design Approach for Order 2222 Compliance
ISO-NE presented its revised Order 2222 compliance proposal to the NEPOOL Markets Committee, including changes to EAS market participation and more.
Shutterstock
ISO-NE, NEPOOL Continue to Conceptualize Capacity Market Sans MOPR
ISO-NE and NEPOOL kicked off a two-day meeting with a session strictly devoted to discussing removing the MOPR from the capacity market.
Shutterstock
NEPOOL Participants Committee Summer Meeting Briefs: June 24, 2021
According to a report from the External Market Monitor, energy prices and uplift costs in ISO-NE are higher compared to other RTO markets.
Shutterstock
In Maine’s GridMod Movement, Innovating on Flexibility Gains Traction
A growing interest in grid flexibility looks beyond demand management to accommodate and balance distributed generation and loads.
Eversource Energy
ISO-NE Planning Advisory Committee Briefs: June 16, 2021
The ISO-NE Planning Advisory Committee heard updates on the RTO's Regional System Plan and the preliminary results of a transmission planning study.
ISO-NE
MOPR Talk Highlight of ISO-NE Consumer Group Meeting
A panel during the quarterly meeting of ISO-NE's Consumer Liaison Group discussed the removal of the minimum offer price rule.
Revision Solar
Formal Work to Remove MOPR Begins at NEPOOL Markets Committee
ISO-NE and stakeholders formally started work on eliminating the minimum offer price rule at a two-day meeting of the NEPOOL Market Committee.
© RTO Insider LLC
FERC Accepts, Rejects Parts of ISO-NE, NEPOOL ORTP Filing
FERC accepted parts of the ISO-NE and NEPOOL “jump ball” filing on offer review trigger price values in a ruling issued late Monday.
© RTO Insider LLC
NEPOOL Participants Committee Briefs: June 3, 2021
The NEPOOL Participants Committee approved the membership application of the New England Power Generators Association at its monthly meeting.

Want more? Advanced Search