New England Clean Energy Connect (NECEC)
With the days of endless cheap hydropower in Québec coming to an end, and the Northeastern U.S. hoping to rapidly scale up intermittent renewables, the two regions may be forced to fundamentally reconsider the role of hydropower on the grid.
Maine’s ethics watchdog has resolved alleged campaign finance law violations surrounding the controversial New England Clean Energy Connect project.
ISO-NE anticipates little risk of energy shortfall in the summer of 2032.
Study looks at severe weather scenarios based on historical data going back to 1950, finds manageable risks of supply shortfall.
A jury ruled Avangrid can resume construction of the New England Clean Energy Connect, potentially voiding a voter referendum to block the $1 billion line.
Avangrid announced Wednesday that its net income increased 16% in 2022 over 2021 but projected flat financials in 2023.
Jim Richmond, CC BY-SA 2.0, via Wikimedia Commons
FERC settled a dispute between NextEra Energy and Avangrid over whether the former should be responsible for upgrading a circuit breaker at Seabrook.
Maine’s high court issued another favorable ruling for the New England Clean Energy Connect project, which analysts say has "resuscitated [its] viability."
Maine’s highest court on Tuesday ruled that a referendum blocking the New England Clean Energy Connect transmission line may have been unconstitutional.
Maine regulators removed a potential obstacle to the New England Clean Energy Connect transmission line, rejecting a challenge by environmentalists and others.
Want more? Advanced Search