November 21, 2024

New England Power Generators Association (NEPGA)

© RTO Insider LLC
FERC Explains Denial of Rehearing on Cold Weather Standard
FERC said petitioners' call to overturn its approval of EOP-012-1 was outside the scope of the proceeding.
Matthew T. Rader, CC BY-SA 4.0, via Wikimedia Commons
FERC Denies Rehearing of Cold Weather Standard
FERC said last week that “by operation of law” it would not reconsider its approval of one of NERC’s new cold weather reliability standards.
ISO-NE
Overheard at ISO-NE Consumer Liaison Group Meeting
ISO-NE’s Consumer Liaison Group held its quarterly meeting in New Hampshire, its first gathering since climate activists won seats in the group in December.
© RTO Insider LLC
Comments Show Battle Lines over ISO-NE Interconnection Costs
ISO-NE and the region’s TOs have asked FERC to dismiss a RENEW Northeast complaint that seeks to shift network upgrade O&M costs off interconnection customers.
Shutterstock
Hydro-Quebec’s Leadership Shakeup Could Impact New England
The resignation of CEO Sophie Brochu sent a shockwave through the Canadian energy sector that could reverberate into New England.
© RTO Insider LLC
Winter Problems, Capacity Accreditation, New Faces on the Docket for ISO-NE in 2023
ISO-NE will start 2023 like it starts every year: worrying about the winter weather.
© RTO Insider LLC
Legislative Action Sought for New England’s Winter Reliability Challenges
New England's natural gas prices are likely to rise this winter and could prompt more supportive policies, stakeholders told the IPPNY Fall Conference.
© RTO Insider LLC
FERC Comes to Vermont and Leaves with a New England-sized Headache
Experts, analysts and lobbyists convened with FERC in Vermont to talk about the issues facing New England’s electric grid in the winter.
Jim Richmond, CC BY-SA 2.0, via Wikimedia Commons
Court Strikes a Blow to ISO-NE Winter Plan
An appellate court ruled that ISO New England’s Inventoried Energy Program would unfairly incent some resources for storing energy in a way they already do. 
Fletcher6, CC BY-SA 3.0, via Wikimedia Commons
FERC Accepts ISO-NE’s MOPR Transition Plan
FERC reluctantly accepted ISO-NE’s plan to remove its minimum offer price rule after a two-year transition period.

Want more? Advanced Search