PJM Interconnection LLC (PJM)
The Washington Post’s warning that “America is running out of power” lacks context and distracts us from the real work at hand, says columnist Steve Huntoon.
Rather than identifying ways to promote further energy efficiency in its footprint, the nation’s largest grid operator — PJM — inexplicably is taking the opposite approach, American Efficient CEO Bo Clayton writes.
Below is a summary of the agenda items scheduled to be brought to a vote at the PJM Markets and Reliability Committee and Members Committee meetings March 20.
The 3rd Circuit vacated FERC’s order allowing PJM to revise a capacity market parameter for the DPL South zone after the 2024/25 auction had been conducted but prior to the publication of its results, ruling that it constituted retroactive ratemaking.
The Planning Committee endorsed PJM’s long-term regional transmission planning proposal, advancing manual revisions that would expand the RTO’s planning horizon to 15 years.
PJM's Market Implementation Committee endorsed a PJM proposal to revise how it measures and verifies the capacity that energy efficiency resources may enter into Base Residual Auctions.
PJM's Operating Committee discussed low reserve response during a spin event in February and the possible impact April's solar eclipse could have on generation and load.
FERC has rejected two complaints from the West Virginia Public Service Commission and the Independent Market Monitor seeking access to PJM's Liaison Committee.
PJM is rejecting a study suggesting it could avoid extending the life of the Brandon Shores generator by installing storage and reconductoring several lines.
Constellation reported strong 2023 earnings and projected strong growth in large part due to its nuclear fleet.
Want more? Advanced Search