PJM Interconnection LLC (PJM)
Generation owners say a PJM filing that asks FERC to approve a change to the parameters of the RTO’s 2024/25 capacity auction is a tariff violation.
What the RTOs told FERC about how they are working to ensure reliability despite a changing generation mix — and what the commenters think of their plans.
PJM’s Brian Chmielewski will review a proposal addressing capacity interconnection rights for effective load-carrying capability resources.
PJM's Planning Committee endorsed a proposed solution for capacity accreditation of intermittent resources under the effective load-carrying capability process.
PJM stakeholders approved new generator deliverability tests and learned of a 3rd competitive window to address "unprecedented" data center load in Virginia.
The PJM MIC endorsed a proposal to increase the maximum number of bids a single corporate entity can place in the RTO’s financial transmission rights auctions.
PJM expects to issue at least $1 billion in penalties over generation outages in December, when plummeting temperatures stretched the region to its limits.
PJM backtracked on posting “indicative” results of the 2024/25 capacity auction in the face of stakeholder opposition.
FERC and NERC will conduct yet another inquiry into cold weather grid failures after Duke and TVA cut power to consumers during December's winter storm.
PJM's first order of business in 2023 will be a review of the “indicative” 2024/25 capacity auction results following concerns of artificially inflated prices.
Want more? Advanced Search