variable resource requirement (VRR) curve
Our summary of the issues scheduled for votes at the PJM MRC and MC on 08/21/14. Each item is listed by agenda number, description and projected time of discussion, followed by a summary of the issue and links to prior coverage.
PJM proposed changing the demand curve to be used in the 2015 Base Residual Auction, while recommending the RTO continue using a combustion turbine as the model for determining the Cost of New Entry (CONE).
Want more? Advanced Search