November 21, 2024

interregional transfer capability

© RTO Insider LLC 
OMS, OPSI Pen 2nd Letter to MISO and PJM to Compel Meaningful Interregional Planning
The Organization of MISO States and Organization of PJM States Inc. have sent a second letter to MISO and PJM emphasizing the need for vigorous interregional transmission planning.
NERC
NERC Examines Transfer Capability in Draft ITCS Installment
NERC released the first installment of the federally mandated ITCS in draft form this week.
Northeast States Collaborative on Interregional Transmission
10 Northeastern States Sign MOU on Interregional Transmission Planning
Ten East Coast states signed a memorandum of understanding to set up a framework to coordinate interregional transmission planning and development.
NERC
NERC Promises 1st ITCS Results by August
NERC said it will release the ITCS by August, with additional U.S. analyses to be completed in November and Canadian results to follow next year.
FERC
Phillips: FERC to Issue Transmission Rule in ‘Very Near Future’
FERC Chair Willie Phillips expressed confidence that the commission will approve its NOPR on transmission planning and cost allocation this year.
NYISO
NYISO Braces for the Coming Winter
NYISO will see improved transmission deliverability within its borders and with PJM this winter but reduced interchange with ISO-NE, stakeholders were told.
© RTO Insider LLC
SERC to be ‘Well Represented’ in ITCS Group
Presenters at SERC's Board of Directors meeting said the region will have a lot of input into the ERO's Interregional Transfer Capability Study.
© RTO Insider LLC
Hickenlooper and Peters Introduce BIG WIRES Act
The BIG WIRES Act would require FERC to set minimum transfer capabilities between regions to better connect the grid in order to promote reliability and ship cheap power around the country.

Want more? Advanced Search