Resources
Demand ResponseDistributed Energy Resources (DER)Energy EfficiencyEnergy StorageBattery Electric StorageOther Electric StorageGenerationCoalGeothermalHydrogenHydropowerNatural GasNuclear PowerOffshore WindOnshore WindOperating ReservesRooftop/distributed SolarUtility-scale SolarResource Adequacy
MISO is determined to file with FERC by the end of March to introduce a probabilistic capacity accreditation that’s controversial among its stakeholders.
PJM is rejecting a study suggesting it could avoid extending the life of the Brandon Shores generator by installing storage and reconductoring several lines.
Constellation reported strong 2023 earnings and projected strong growth in large part due to its nuclear fleet.
A group of demand response providers in PJM proposed adding two hours to the availability window that binds when the resource can be deployed by the RTO.
PSEG still is waiting to hear from the Treasury Department on the rules on the Production Tax Credits that are part of the Inflation Reduction Act.
Advanced Energy United has released a scorecard that ranks the seven domestic ISO/RTOs on their generator interconnection processes, finding room for improvement in every one.
PJM proposed changes to how it measures and verifies the capacity contribution of energy efficiency resources, drawing concerns the RTO is moving too fast to implement changes ahead of the next capacity auction.
With the days of endless cheap hydropower in Québec coming to an end, and the Northeastern U.S. hoping to rapidly scale up intermittent renewables, the two regions may be forced to fundamentally reconsider the role of hydropower on the grid.
ISO-NE, MISO, PJM and SPP released a report calling for improvements to the coordination of the electric and natural gas systems.
A new report indicates battery energy storage system failures are ramping up with the spread of the technology, and most often occur in new systems.
Want more? Advanced Search