November 17, 2024

reliability-must-run (RMR) agreements

© RTO Insider LLC
PJM OC Briefs: June 8, 2023
The OC endorsed a joint proposal for PJM, transmission owners and market participants to increase information sharing ahead of extended transmission outages.
ISO-NE
NEPOOL PC Briefs: May 4, 2023
ISO-NE gave the Participants Committee a review of the past winter and a preview of the next — with and without the Everett LNG terminal.
© RTO Insider LLC
PJM CEO, Panelists Address Reliability During Annual Meeting
PJM's CEO said challenges lie ahead for stakeholders as they wrestle with a possible overhaul to the capacity market to address resource adequacy concerns.
Monitoring Analytics
PJM Monitor: Rise in Fuel Costs Led to Record-high Prices in 2022
Average PJM LMPs doubled to a record-high $80/MWh last year, driven mostly by coal and natural gas prices, the RTO’s Independent Market Monitor reported.
PJM
PJM Whitepaper to Highlight Future RA Concerns
New capacity being installed on PJM’s grid may not keep pace with rate of retirements and accelerating load growth, according to a pending PJM whitepaper.
Constellation Energy
Narrow Set of Options for Retaining Everett LNG Terminal
The fate of the LNG import terminal in Everett, Mass., has come into increasingly sharp focus in the last few months.
Antandrus, CC BY-SA 3.0, via Wikimedia
CAISO Extends RMR Contracts for Gas Plants
The CAISO Board of Governors approved the renewal of reliability-must-run agreements for four small aging gas plants it says are needed for grid reliability.
© RTO Insider LLC
PJM Operating Committee Briefs: July 14, 2022
PJM's Operating Committee advanced plans to ease the scheduling of network service and manual language for hybrid resources.
© RTO Insider LLC
NERC Chief: ‘Longer, Deeper, Broader’ Weather Presents New Reliability Challenges
Extreme weather events have brought “extraordinary clarity” about reliability risks posed by climate change, NERC CEO Jim Robb told an EPSA conference.
Fletcher6, CC BY-SA-3.0, via Wikimedia
FERC Lowers ROE for Exelon’s Mystic Plant to 9.19%
FERC voted 3-1 to reduce the base return on equity for Exelon’s Mystic Generating Station as part of its reliability-must-run agreement with ISO-NE.

Want more? Advanced Search