November 19, 2024

NERC: Board’s 321 Authority on the Table for Cold Weather Standard

NERC Vice President of Engineering and Standards Soo Jin Kim on Nov. 12 said the ERO’s ongoing cold weather standards project could supply the next opportunity for the Board of Trustees to exercise its authority to streamline the normal stakeholder approval process. 

Speaking at a technical conference about Project 2024-03 (Revisions to EOP-012-2), Kim acknowledged “there’s a little bit of industry fatigue” around the effort. She was referring to the fact the cold weather standard is undergoing its second set of revisions after FERC approved the original version, EOP-012-1 (Extreme cold weather preparedness and operations), in 2023 and its successor, EOP-012-2, this year but ordered changes each time. (See FERC Orders Further Cold Weather Standard Modifications.) 

The deadline for the FERC-ordered revisions to EOP-012-2 is next March, but the replacement standard EOP-012-3 recently failed to gain industry approval in its first formal ballot period that concluded Nov. 5. The standard received 70 supportive votes from industry stakeholders but 129 negative votes with comments; 55 respondents either abstained or did not vote. The result was a segment-weighted 42.29% in favor of passage, well short of the two-thirds majority needed to put it before the board. 

A similar situation caused the board to invoke for the first time its authority under Section 321 of NERC’s Rules of Procedure at its last open meeting in August. On that occasion, the failure of PRC-029-1 to receive industry approval led the board to direct the Standards Committee to host a technical conference in September to hear industry feedback on the proposed standard. Convening a tech conference is among the options in the section available to the board if stakeholders do not pass a proposed standard directed by FERC or NERC. 

In the case of PRC-029-1, FERC had ordered NERC to develop standards governing inverter-based resources. (See “Board Invokes Standards Authority to Meet IBR Deadline,” NERC Board of Trustees/MRC Briefs: Aug. 15, 2024.) Following the conference, NERC used the input to revise the standard, and it subsequently passed a final ballot, which was submitted to FERC along with four other standards governing IBRs. 

Following the success of the new process, NERC indicated it might convene technical conferences for other projects that have faced difficult ballot processes, in hopes of proactively addressing stakeholder concerns. At this week’s conference, Kim said additional action — including another use of the Section 321 powers — has not been ruled out. 

“I have gotten a lot of questions with regard to [whether] this project [would] be a candidate for 321 action,” Kim said. “The answer is ‘yes.’ We do feel this risk is very critical, and this is one of those projects where, if we are at an impasse … would be a candidate for 321 recommendations.” 

Kim emphasized that NERC’s board has not made any decision about whether to invoke the Section 321 authority at this point and will “probably” not discuss the issue at its open meeting in December; the standard’s “next ballot will be the determining factor,” she added.  

She explained she wanted to be “very transparent” about the possibility of special action after NERC received feedback from industry that the ERO had not been forthcoming about its consideration of using Section 321 for the IBR standards.  

“I don’t want anyone to ever come back and say that we were not very upfront about whether or not this is a potential risk for us moving forward,” Kim said. “We are very concerned [about] making sure that industry is able to mitigate these risks with regard to certain timelines.” 

SouthCoast Wind Nears Federal Approval with FEIS Release

The U.S. Bureau of Ocean Energy Management (BOEM) issued the final environmental impact statement (FEIS) for SouthCoast Wind on Nov. 8, bringing the project one step closer to final approval.  

The project’s construction and operations plan would allow for the development of up to 2,400 MW of power on a 127,388-acre lease area south of Massachusetts. Rhode Island and Massachusetts recently selected 1,287 MW of power from the project’s first phase of development in a coordinated solicitation. (See Multistate Offshore Wind Solicitation Lands 2,878 MW for Mass., RI.)

SouthCoast Wind developer Ocean Winds, owned by EDP Renewables and ENGIE, predicts that SouthCoast Wind 1 will come online by 2030. It recently received several key state environmental approvals from Massachusetts, where the project will interconnect to the grid. 

“Completing this environmental review represents another major milestone in the [Biden] administration’s commitment to achieving clean energy objectives that will benefit local communities,” said BOEM Director Elizabeth Klein. 

BOEM plans to publish the notice of availability of the FEIS in the Federal Register on Nov. 15. That will be followed by a 30-day waiting period before the agency can issue a final record of decision. 

The agency considered how the project proposal and several alternatives would affect local communities and the environment, qualitatively evaluating benefits and adverse impacts. BOEM conducted isolated impact analyses of the project alternatives as well as cumulative impact analyses, which evaluate project impacts within the context of outside stressors including climate change and other planned offshore wind projects.   

Regarding ecosystem and wildlife effects, the report found the proposal would have minor adverse impacts on local birds, bats and sea turtles, and moderate adverse impacts on benthic resources, coastal habitat and fauna, fish habitat, marine mammals and wetlands.  

The statement noted that the habitat of several endangered species of whale, including the critically endangered North American right whale, overlaps with the project area.  

To limit harms to marine mammals, BOEM identified a preferred project alternative that would remove six wind turbine generators (WTGs) from a part of the lease area adjacent to the Nantucket Shoals, which it wrote is “an area of high biological productivity.” 

“The removal of six WTGs in the northeastern edge of the lease area would reduce potential noise disturbance in turbine positions closest to Nantucket Shoals, thus decreasing associated risks to marine mammals, especially [North American right whales], that are known to use this area,” BOEM wrote, adding that the alternative similarly would reduce risks from vehicles in this area.  

BOEM found the preferred alternative would have a moderate adverse impact on whales, but noted the possibility of major adverse impacts on right whales due to the species’ small remaining population and the disproportionate impact a single death could have on the species’ viability. 

The agency found the proposal would lead to major cumulative impacts on the fishing industry, writing that “some fishing operations could experience long-term, major disruptions.” 

The proposal also would affect cultural resources and scenic resources and could have a disproportionate impact on Tribal Nations, BOEM said. The project’s construction also could cause an increase in local air and noise pollution, coastal land use challenges, increased vessel traffic and conflicts with the tourism industry, BOEM found.  

The no-build alternative — which accounts for the effects of climate change and the development of other offshore wind projects — also demonstrated many similar adverse effects, BOEM noted. 

For benefits, the agency found the project would bring employment opportunities and tax revenue associated with the offshore wind industry, port infrastructure improvements, and emissions and climate benefits for displaced fossil generation.  

Offshore wind industry representatives applauded the release of the FEIS, which came at the end of a turbulent week for offshore wind companies in the wake of the U.S. election. 

“With its final approval later this year, the U.S. market will have 11 commercial-scale projects either completed, under development, or ready to break ground, representing more American jobs and tens of billions of dollars in economic activity,” said Liz Burdock, CEO of the Oceantic Network. 

Burdock gave a nod to the first Trump administration for issuing SouthCoast Wind’s lease and emphasized the project’s potential economic and employment benefits.  

Trump took aim at the offshore wind industry in the leadup to the election, but offshore wind leaders hope the industry has enough momentum and support to survive Trump’s second term in office. (See Clean Energy Sectors Brace for Impact of Trump 2.0.) 

Stakeholder Soapbox: AI, Electric Grid Can be Partners in Equitable Energy Transformation

By Colette D. Honorable

Artificial intelligence, once envisioned only in science fiction, is becoming commonplace in our offices and homes. Ironically, the AI-enabled features of a modern world — from internet searches to chatbots to digital assistants — are all powered by an energy system that has been going strong for over 100 years.

Just as AI may be the most significant technological advancement of this millennium, the energy grid was the most important engineering achievement of the last. It was built to last, and while the way the world produces power has evolved, how energy flows — from power sources then over poles and wires to our homes and businesses — is largely unchanged from when the system was designed.

What has dramatically changed is the demand on that system. Exelon has a number of high-potential data center projects in our pipeline that together would require 11 GW of additional load. To put that in perspective, 1 GW can power close to a million homes. As an example of the magnitude of data center development that already has taken place, in the Chicagoland area alone, Exelon helped launch 20 data centers over the past two years.

We have been modernizing and strengthening our energy grid to meet residential, small business and commercial customers’ electrification needs, and like much of the technology to which we have grown accustomed, the grid has gotten smarter and more complex. Our smart grid provides many benefits to our operations and customers, including the ability to automatically reroute power when there’s damage, improving reliability by shortening repair time and reducing customer outages.

As AI advances, it will bring even more benefits to the energy system that powers it, including predictive maintenance, bolstered cyber security and enhanced employee training. In turn, the grid will be more efficient, more reliable and better able to meet AI’s energy demands.

Exelon is proud to support the expansion of the data centers that house the computer systems, servers and storage needed to sustain AI. We see data centers as key partners, and we are committed to supporting their growth and development, while also meeting the increasing demands for sustainable and reliable electricity.

grid

Colette Honorable | Exelon

Recent proposals for co-location, a practice in which data centers are built next to a power plant, have gained attention, with FERC convening a technical conference on the subject Nov. 1 and rejecting as unsupported a precedent-setting interconnection agreement involving a data center and a nuclear generator. That agreement, which did not conform to standard terms, would have raised electricity bills for residential and other customers.

If data centers are connected to the grid — even if their first point of connection is a generator — they should contribute to the cost of the network infrastructure providing those services. Most data centers do just that. However, if co-located data centers are not recognized as network load, we estimate the annual electric bill for residential customers in the surrounding region could increase by up to $214.

Co-locating with an electricity generator also presents important considerations for the data center on how dependent they want to be on a single generator — rather than the entire electric grid — for reliable service. At the FERC technical conference, an advocate for co-location acknowledged this dependence may not be the best choice for a data center running defense critical services given the risk.

Co-location presents an opportunity to support the ongoing nationwide energy transformation and promote economic development in the communities we serve. We are proud that Site Selection magazine once again named two of our local energy companies, ComEd and PECO, to their 2024 list of the “Top 20 utilities in economic development,” based on the number of facility investment projects attracted to their service areas, the capital investment and potential for job creation.

We also agree with the Biden administration’s desire to operate data centers within U.S. shores, mitigating concerns about foreign control of these critical assets. It is important, then, to understand and be clear: This effort can and will continue, and we will help facilitate it.

We are committed to continuing our work with data centers to meet their needs, no matter where they are located. And, even with demands that far exceed what the energy pioneers may have envisioned, the energy grid of today is ready to meet the moment, just as it was a millennium ago.

Exelon looks forward to continuing to lead the energy transformation, with future generations in mind, in a way that is equitable for all our customers and communities.

Colette D. Honorable is Exelon’s EVP of public policy and chief external affairs officer.

To submit an opinion piece, see our guidelines.

MISO to Install Former SoCal Utility Executive on Board of Directors

Former Southern California Edison Senior Vice President Erik Takayesu will join MISO’s Board of Directors beginning Jan. 1 after a vote among its membership.  

Takayesu will be joined by current board members Nancy Lange and Mark Johnson, who also earned sufficient support from MISO members to serve additional terms. (See MISO Board Week Covers Supply Worry, SoCal Utility Exec Addition, $400M Budget.)  

Johnson was allowed to stand for an additional three-year term beyond MISO’s customary three-term limit through a waiver of its bylaws. MISO’s board uses waivers to retain institutional knowledge on the board when necessary.  

MISO’s board members and membership decided they needed to hang onto Johnson’s system planning expertise after it warned that in addition to departing Director Phyllis Currie, other current board members H.B. “Trip” Doggett, Barbara Krumsiek and Todd Raba would hit their three-term limits at the end of 2025. (See Extensions Likely for MISO’s Term-limited Board Members.) 

Lange was up for re-election for her third and final term.   

MISO’s board elections require candidates to earn a majority of votes in support among membership. Members can vote for or against or can abstain from selecting any of the candidates. The elections require a minimum 25% participation among MISO’s approximately 140 voting-eligible members to achieve quorum. The RTO again used VoteNet Solutions to conduct its monthlong membership vote of the candidates.  

MISO’s board and leadership praised Takayesu’s appointment.  

“The continued service of directors Johnson and Lange provides continuity as we manage the changing energy landscape, and Director Takayesu has a wealth of industry experience to help solve the complex problems we’re facing,” MISO CEO John Bear said in a press release. “Overall, our board members bring a cross-section of knowledge to steer us in the right direction.” 

“Director Takayesu is a welcome addition to the board, and directors Johnson and Lange will continue to provide key insight and institutional knowledge as we navigate the energy transition,” MISO Board Chair Todd Raba said. “We appreciate Director Currie’s leadership during her tenure on the board. Her steady guidance served as a model for her fellow directors.” 

While at Southern California Edison, Takayesu led the utility’s business and asset management strategy, system planning, technology demonstration and development and wildfire safety. Takayesu currently serves as a member of the Department of Energy’s Electricity Advisory Committee. 

The Board of Directors will meet for a final time this year Dec. 12 as part of MISO Board Week. 

Company Briefs

CenterPoint Receives Recommendations Over Beryl Response, Hires Emergency Preparedness and Response VP

PA Consulting Group, the independent third party responsible for reviewing CenterPoint Energy’s response to Hurricane Beryl, made 77 recommendations aimed at improving the company’s readiness, response and communication during future storms and/or emergency situations. 

So far, CenterPoint said it has completed 18 of the recommendations and is in the process of completing 33 more. The company said it would evaluate the remaining 26 as it continues to formulate its long-term resiliency efforts that will be announced next year. 

CenterPoint also hired Don Daigler to oversee a revamp of its emergency preparedness and response. Daigler, founder and CEO of Resilience Advisory Services, a consulting firm specializing in resiliency across critical infrastructure sectors, will join the company as its senior vice president for emergency preparedness and response in mid-November. 

More: Houston Public Media, Houston Chronicle 

Acciona Energia Acquires 2 Texas Wind Farms

Spain’s Acciona Energia announced the acquisition of two wind farms in Texas totaling 300 MW. The company paid $202.5 million to buy the Green Pastures I and II wind farms from various private asset management entities. 

More: Renewables Now 

Enlight Signs PPA with APS

Enlight Renewable Energy’s U.S. subsidiary, Clenera, announced it has signed a 20-year power purchase agreement with Arizona Public Service for its Snowflake A Project. The project, which will provide 600 MW of solar and 1,900 MWh of storage availability, is expected to be operational in 2027. 

More: Solar Industry Magazine 

State Briefs

CALIFORNIA 

Southern California Edison Enacts PSPS

Southern California Edison has enacted public safety power shutoffs and cut off power to tens of thousands of customers due to heightened wildfire risk. The extreme wind event generating 70-to-80-mph winds ignited two fires around Santa Ana. Shutoffs, which had affected Los Angeles, San Bernardino, Riverside, Ventura, Orange and Santa Barbara counties, were extended into parts of Kern and Tulare counties. 

More: Los Angeles Times 

Voters Approve $10B Climate, Environmental Bond

Voters approved $10 billion in bonds for climate and environmental projects. Proposition 4 will fund projects to safeguard drinking water, combat wildfires, protect natural lands, and improve resilience against floods and extreme heat. Water projects will get about $3.8 billion. Half of that portion, $1.9 billion, will be spent on improving water quality, while the rest will be spent on protecting the state from floods and droughts and restoring rivers and lakes. 

More: CalMatters 

COLORADO 

Weld County Approves Solar Project

The Board of Weld County Commissioners voted 4-1 to approve a solar farm. The project, which is being developed by Balanced Rock Power and Taelor Solar, will sit on 4,300 acres in Weld County and 4,100 acres in Morgan County. The project had gained approval from Morgan County and the Weld County Planning Commission. 

More: KUNC 

Xcel Energy Ordered to Remove Investor Relations, Exec Salaries from Customer Costs

The Public Utilities Commission ordered Xcel Energy to remove all investor relations costs — including a portion of executive salaries — from its calculations of costs passed on to customers. Following the 2022/23 winter, the legislature convened a special committee to investigate rates. The result was Senate Bill 291, which took aim at 15 types of expenses that should not be paid by customers, such as a portion of board of directors’ compensation, travel and entertainment expenses. In a current gas rate case, more than $775,000 in such costs were disallowed.

More: The Colorado Sun 

CONNECTICUT 

Siting Council Approves Solar Facility Plan

The Siting Council has approved a $3.75 million solar facility in Enfield. Lodestar Energy will develop the 1.93-MW solar facility on 12.1 acres of unused farmland. Construction is expected to take between six to nine months. 

More: Stamford Advocate 

INDIANA 

Regulators Approve AES Natural Gas Conversion

The Utility Regulatory Commission has cleared the way for AES Indiana to transition two units at its Petersburg Generating Station from coal to gas. The repowering of Petersburg Units 3 and 4 will be staggered so that only one unit is offline at a time. Unit 3’s conversion is expected to start in February 2026 and be completed in May 2026. Once completed, it will take about one month for startup, commissioning and testing to reach a commercial operation date in June 2026. Unit 4’s outage would start in June 2026 and be completed in October 2026. The move is expected to save $281 million over 20 years. 

More: Indiana Capital Chronicle 

MASSACHUSETTS 

OSW Contracts Delayed Until February

The evaluation team that includes the Department of Energy Resources, National Grid, Eversource and Unitil has informed the Department of Public Utilities it will not meet the targets for finishing contract talks or contract filings for the latest round of the state’s offshore wind projects. 

“The contracting parties have not yet completed their contract negotiations and are now targeting the completion of negotiations and execution of contracts with all three counterparties on or before Jan. 15, 2025. Accordingly, the evaluation team is now targeting the filing of contracts with the department on or before Feb. 25, 2025,” the letter said. 

The latest delay means contracts almost certainly would be filed after Donald Trump returns to the White House. 

More: CommonWealth Beacon 

MICHIGAN 

PSC Approves DTE Gas Rate Increase

The Public Service Commission has approved a rate increase for DTE Gas but is requiring the company to take steps toward reducing emissions and costs. Residential customers can expect about a $2 increase on their monthly bills. It is the second rate increase for DTE Gas in four years. Plans to reduce emissions and costs include incorporating the state’s emissions and electrification goals and planning for a decrease in the use of natural gas. 

More: Michigan Public Radio 

MISSISSIPPI 

PSC Announces Hearing for Holly Springs Services

The Public Service Commission has announced it will open an investigation into the services provided by the Holly Springs Utility District. The city of Holly Springs has been summoned to appear before the commission on Jan. 7, 2025. The PSC said the decision follows months of complaints from the utility’s customers. 

More: WJTV 

VIRGINIA 

Balico Withdraws Application for Pittsylvania Power Plant, Data Center

Balico announced it was withdrawing its application to bring a power plant and data center to Pittsylvania County but said the project was not dead. The plans called for a 3,500-MW natural gas power plant to tap into the Mountain Valley Pipeline. The plant would have provided energy for a data center complex comprised of 84 two-story structures. 

More: Danville Register & Bee 

WISCONSIN 

PSC Approves Rate Hikes for We Energies, WPS

The Public Service Commission has approved rate increases for We Energies and Wisconsin Public Service. We Energies received an 8.79% increase over the next two years that will equate to a $7.62 increase in 2025 and a $9.73 increase in 2026. Wisconsin Public Service was approved for a 7.33% increase over two years. It will raise customers’ bills $7.11 in 2025 and $5.04 in 2026. 

More: Wisconsin Public Radio 

Federal Briefs

TVA Approves PPA for Memphis Supercomputer Site

The Tennessee Valley Authority has approved a power purchase agreement with Elon Musk’s xAI supercomputer facility in Memphis. The facility is expected to use up to 150 MW at peak. Any company using more than 100 MW requires TVA approval. The facility is online and using temporary gas turbines for power. 

More: Memphis Commercial Appeal 

FERC Gives Venture Global Permission to Introduce Natural Gas into LNG Plant

FERC has approved Venture Global LNG’s plans to introduce natural gas into its Plaquemines export plant in Louisiana. The company can commission and introduce natural gas into its “fuel gas and warm flare” systems, FERC wrote in its order. It is allowed to introduce gas to other parts of the facility once the company complies with the conditions of the order. The 20 million metric tons per annum Plaquemines LNG plant will be the second-largest U.S. export facility when fully operational. 

More: Reuters 

NY Solar Summit Looks for Continued Momentum

ALBANY, N.Y. — Celebration of a milestone achieved and concern about hurdles facing the next milestone were front and center as the New York Solar Energy Industries Association convened its annual Solar Summit.

New York reached 6 GW of distributed solar in October, 14 months ahead of the statutory target, thanks to supportive policies, public-private cooperation and more than $3 billion in state support.

There is concern, however, that the buildout effort is growing more difficult because of local restrictions, interconnection difficulty and regulatory delays.

NYSEIA represents 240 companies working in the rooftop and community solar sectors and advocates for changes that will help them reach the state’s next target — 10 GW of distributed solar by 2030.

How best to do this was a recurring theme at the Nov. 6-7 event.

Goal Reached

New York’s 6 GW of distributed solar includes more than 2 GW of community solar, the most of any state. (See NY Surpasses 6 GW of Distributed Solar Capacity.)

It is a bright spot for a state that has struggled to bring larger-scale renewables online and expects to miss its statutory goal of 70% renewable electricity by 2030, perhaps by a wide margin. (See NY Expects to Miss 2030 Renewable Energy Target.)

New York is known as a slow and expensive place to develop generation and transmission but distributed solar with its smaller and more nimble profile has had an easier time than larger-scale solar and wind.

NYSEIA Executive Director Noah Ginsburg told NetZero Insider that extensive groundwork and policy support begun by the state several years ago allowed distributed solar to flourish, but the momentum is threatened.

“As we run into increasingly restrictive local laws, which really have proliferated across the state in the last couple years, and reduced hosting capacity on our electric distribution system, it’s a new set of challenges,” he said. “And the same kind of resolve and proactive approach that we had five years ago to create the conditions for our success, we need to do that again.”

A lot of the low-hanging fruit — the easy-to-develop sites — is gone, and there are other potential problems ahead. The summit was focused on state policies rather than federal, but the election of a president antagonistic toward climate protection and clean energy could not be ignored.

“It’s foundational,” Ginsburg said of federal financial support. “Projects don’t pencil without the investment tax credit.”

Noah Ginsburg, NYSEIA | © RTO Insider LLC

Americans support solar, he said, and its economic benefits transcend partisan boundaries.

“So I am hopeful that the federal government’s not going to pull out the rug from under the industry, but to me, what happened with the federal election just highlights the importance of state leadership.”

The agencies leading New York’s clean-energy transition were well-represented at the NYSEIA summit, including the Department of Public Service, Department of Environmental Conservation and New York State Energy Research and Development Authority.

NYSERDA Chief Program Officer Anthony Fiore delivered a keynote address highlighting the achievements to date and crediting the public-private partnership for making them possible.

“More than 1 million homes across New York state are being powered by renewable energy sources, and we’re seeing the impact of this on grid reliability,” he said. “This past summer, we saw an 8% decrease in peak demand because of behind-the-meter solar. That’s incredible!”

Panel discussions looked at ways to preserve the momentum.

What Works, What Needs Work

NYSEIA Board President Daniel Montante, co-founder of Montante Solar, boiled the wish list down to four key points: Siting reform; flexible interconnection and interconnection reform; rate design improvements; and targeted incentives for installations that provide tangential value, such as benefiting disadvantaged communities or repurposing brownfields.

That is a tall order, in New York or anywhere else. Montante tried to recruit the crowd at the summit into NYSEIA’s advocacy role in lawmaking and policy writing. “Getting policies like this in place is a big lift, but many hands make work light,” he said. “NYSEIA is the tip of the spear.”

Anthony Fiore, NYSERDA | © RTO Insider LLC

Kelly Friend, vice president of policy at Nexamp, described a culture of support for solar within New York state government and a pattern of state agencies making challenges surmountable. “You had the sustained effort to maintain a long trajectory,” she said. “I think that we can probably contrast markets where it’s not working.”

However, she and other panelists said, there also are some things in the New York market that are not working.

Kevin Schulte, CEO of GreenSpark Solar, said business is mixed for his company — commercial/industrial is thriving but residential is struggling. “We’ve had to start looking at other markets for the first time in more than half a decade, to make sure that we can keep all of our people busy moving forward,” he said.

Finding overlap between grid hosting capacity and permissive local permitting is a challenge, he added.

Friend made the same point about local restrictions: “If we’re going to hit the next [state distributed solar] goal that we’re going to set, we can’t continue this paradigm of getting into regulatory dockets, burning a ton of cash to engage those.”

Schulte said greater transparency from utilities on things like the cost of a transformer or the load profile of a circuit would be very helpful in general and would be critical if there is to be an industry-utility partnership on things such as virtual power plants.

Matt Foran, National Grid’s vice president of account management, said there is some data the utility cannot share, but it will try to be more transparent.

“Starting with project cost data, the SIR reports, we’re endeavoring to share more of that, update our cost estimates more frequently, so that we are sharing that information more often than we have in the past,” he said. “We know it’s a pain point.”

Multiple speakers urged valuation of distributed energy resources such as solar and storage beyond their nameplate capacity and impact on the grid.

Friend said VDER, the Value of Distributed Energy Resources mechanism New York created in 2017, was revolutionary for its “value stack” treatment of an asset’s benefits to the grid.

“But let’s not think about the benefits just on the electric grid,” she said. “What are the public health benefits? What are the other benefits we get from not burning gas and not burning other fossil fuels? And how do we incentivize projects to show up and produce electricity without those externalities? And let’s bake that into the equation of how we incentivize these projects.”

Making Friends

New York has a strong home-rule tradition that complicates state government’s efforts to bring about change. There are more than 1,000 jurisdictions in the state and many different stances on renewable energy, ranging from support to skepticism to flat opposition.

The state in 2020 attempted an end-run around this by creating the Office of Renewable Energy Siting (ORES) and giving it power to override local rules on renewable proposals of 20 MW or larger under an obscure-sounding law called Section 94-c. And it did this through the famously opaque state budget negotiating process, during the COVID lockdown.

Jason Kaplan, PowerMarket | © RTO Insider LLC

This was as unpopular with local governments as one might expect, and increasingly, their response has been to place moratoria and restrictions on wind, solar and storage development.

Ginsburg said NYSEIA estimates 4.6 GW of potential solar development is thwarted by local restrictions.

Matthew Eisenson, senior fellow at the Sabin Center for Climate Change Law at Columbia Law School, said a national report by the center found New York has one of the greatest concentrations of restrictive local laws. For a deeper dive, he recommended a Lawrence Berkeley National Laboratory report examining the motivations. (See Renewable Development Faces Regulatory Tangle.)

“There’s an irony here in that community solar generally attracts less opposition than utility-scale solar, but it’s more vulnerable to local restrictions,” Eisenson said.

Sarah Brancatella, deputy director of the Association of Towns, pushed back on the term “restrictive local laws” and on the image of local officials as obstructing the clean energy transition. There probably are some solar haters in local government, she said, but generally, local leaders are trying to do what’s best for their communities.

“Are they restrictive local laws, or are they just land-use laws? Are they just restrictive because we’re not letting developers do whatever the hell they want?” Brancatella asked.

“There’s a lot of sour feelings about 94-c,” she reminded the audience. “There can be a conflation between utility-scale solar and community solar, but the fact of the matter is that you guys are dealing with the reverberations from the way that 94-c was enacted.”

Ginsburg has wished aloud that ORES or something like it could expand its authority to include small renewable projects, and he asked a panel discussion about the idea. Brancatella said she and her membership would oppose that.

Brancatella also pushed back on the idea that local restrictions are as widespread as Eisenson suggested — there are 933 towns, and only about 9% have passed such laws per year since 94-c, she said.

Jessica Waldorf, Office of Renewable Energy Siting | © RTO Insider LLC

Katie Soscia, executive director of development at Montante Solar, offered some pushback of her own: A map of towns with good interconnection potential and a map of towns that have restrictive laws would probably show considerably more than 9% overlap, she said.

Not coincidentally, areas with interconnection capacity draw the strongest interest from solar developers to the point that some consider saturation.

Jessica Waldorf, interim executive director of ORES, said the state is trying to ease this pressure by creating more opportunities for interconnection.

“One of the things that we can do better as a state, and that we are doing, is through our Coordinated Grid Planning Process and some of the other investments that the Public Service Commission has authorized to date, we’re looking at ways to expand the capacity of the transmission system, to open up new areas to development.”

Influencing People

Proactively expanding transmission capacity before it is needed has been a strategy the state is pursuing, but results are years away.

How to get a 5-MW solar array now stalled in review off the drawing board and into construction calls for a whole different set of strategies.

New York’s towns range from several hundred thousand residents to fewer than a hundred, from Hamptons glitz to Appalachian poverty. So there is no one-size-fits-all approach to developing solar power in them. Each project will be different.

There was no shortage of suggestions about what works and does not work from Brancatella, Eisenson, Ginsburg, Soscia, Waldorf, Tony DeFazio of Sustainable PR and David Sandbank, NYSERDA’s vice president of distributed energy resources.

These include:

    • Understand why a town has placed a setback restriction on solar panels — do they not want them nearby, not want them at all, or just not want to see them? Address those concerns.
    • Get feet on the ground for conversations to understand what locals want and do not want. Do this face-to-face — remote digital research is ineffective.
    • Win over the leaders and influencers in the community and use them as the hubs in a hub-and-spoke campaign to build wider support.
    • Do not talk down to communities about their need to contribute to the state’s climate goals.
    • Local officials like the idea of agrivoltaics and of preserving farmland for eventual reuse in farming rather than losing it forever to housing development.
    • Jobs are not an effective selling point as solar projects do not create many local jobs.
    • Ask the closest neighbors what they think — a visual screen around solar panels is all some people really want.
    • Explain the difference between community solar and utility-scale solar — early and repeatedly, without being pedantic.
    • Understand what benefits a particular host community is most interested in, then provide certainty and clarity about delivering those benefits.
    • Provide certainty and clarity about decommissioning a project, as well. The repeated sale and resale of a project from one company to another does not increase confidence that when it reaches the end of its service life, it will be removed as promised.

Making the Case

In the case of community solar, developers can win local approval only to find they still need to win more local support.

New York has high electric rates, and many New Yorkers have trouble paying their bills — as of September, the six investor-owned electric utilities reported nearly 1 million residential customers more than 60 days in arrears on a total of $1.52 billion in charges.

Sarah Brancatella, Association of Towns | © RTO Insider LLC

A key aspect of New York state’s support for distributed solar is directing its economic benefits to disadvantaged communities, those that could most benefit from lower power costs.

But it can be hard to recruit members of those communities as subscribers, said Jason Kaplan, chief legal officer of PowerMarket, which connects 92,000 customers to the 980 MW of community energy it manages.

“Definitely there have been challenges because we’re engaging with communities that, frankly, have been historically marginalized from renewable energy for a whole host of reasons, and there’s great skepticism when you go to the marginalized communities and say, ‘Hey, but guess what? I’ve got a product that’s gonna give you just guaranteed savings, and you don’t have to worry about anything else.’”

His solution to recruiting subscribers for community solar is similar to those offered earlier for winning approval to build the installations in the first place:

Enlist the support of trusted local voices to explain the benefits of community solar, then deliver those benefits.

And it has worked in New York, in places like Utica, Dunkirk and Clay.

“We’ve just seen an amazing success when it comes to those partnerships,” Kaplan said. “The town of Clay, we literally had like 800 residents. They were over-subscribing one of our projects, and we’re going to deliver that town’s residents over $130,000 in direct savings.”

This is the promise of distributed solar — collective benefit to the planet and pocketbooks that far exceeds its small individual pieces.

Helping deliver on that promise is the job of NYSEIA’s members, and while it is a business proposition for them, it also serves the larger picture of pushing New York closer to its climate and equity goals, even a few kilowatts at a time.

Matthew Eisenson, Sabin Center for Climate Change Law at Columbia Law School | © RTO Insider LLC

To cite the most extreme contrast, it can take more than a thousand of these small solar systems to equal the output of a single offshore wind turbine. However, there are nearly a quarter-million sites making up the 6 GW distributed solar total in New York, and just a dozen offshore turbines rated at a combined 132 MW.

There is room for both large and small, and a need for the unique strengths of both, Ginsburg told NetZero Insider.

When he calls for doubling New York’s next distributed solar target to 20 GW by 2035, he is not suggesting the state give up on large renewables but advocating for greater support for what has worked so far.

“The state of New York is projecting, what is it, a 45,000-GWh gap in renewable electricity supply by 2030,” he said. “As much as I have a lot of confidence in the people in this room, I don’t think they’re going to close that gap on their own.”

He added: “I think we really do need a diversified clean energy mix. It’s true that one wind turbine can generate as much power as a thousand residential solar projects. It’s also true that we can build a thousand residential solar projects in a good month, and it takes years to get permits for the large-scale projects.

“To me, the message is we need to be building all these resources, and let’s do it in a smart way.”

PNM Picks CAISO’s EDAM

Public Service Company of New Mexico announced Nov. 11 its intent to join CAISO’s Extended Day-Ahead Market, extending EDAM’s reach farther into the Desert Southwest in its latest victory over SPP’s Markets+. 

In a statement, PNM CEO Don Tarry cited the utility’s experience with CAISO’s Western Energy Imbalance Market (WEIM) as a factor in the decision. PNM has received $125 million in benefits since joining WEIM in 2021. 

“Participating in EDAM is the next step in realizing the value of New Mexico’s renewable energy potential for our customers, helping us ensure continued clean and reliable service at the lowest possible cost,” Tarry said. “We know from our experience with the WEIM … [that] coordination with other regional utilities can continue to deliver substantial efficiencies and cost benefits for our customers.”

With about 550,000 customers, PNM is New Mexico’s largest electricity provider. The utility said it plans to begin EDAM participation as soon as 2027. 

CAISO CEO Elliot Mainzer said the ISO was pleased by PNM’s announcement.  

“We look forward to building on the proven track record of the Western Energy Imbalance Market to deliver even greater economic and reliability benefits to PNM customers,” Mainzer said in a statement. 

Modeling Connectivity

Playing a large role in PNM’s choice of EDAM was a study The Brattle Group conducted for PNM and El Paso Electric that compared projected benefits of the utilities joining either EDAM or Markets+. 

The production cost study carefully modeled transmission connectivity. It modeled a scenario in which three Arizona utilities — Arizona Public Service, Salt River Project and Tucson Electric Power — join Markets+. The Arizona utilities haven’t yet announced their day-ahead market choices, but they have expressed a preference for SPP’s market and have participated in its development. 

Even with the Arizona utilities in Markets+, projected annual benefits for PNM would be $20.5 million if it joined EDAM, compared with $8 million from participating in Markets+. (See Brattle New Mexico Study Shows EDAM Benefits Outpacing Markets+.)  

The Brattle results gave reassurance that PNM didn’t have to follow the market choice of Arizona utilities in order to realize day-ahead market benefits. 

“The Brattle study reinforced that PNM has adequate transmission connectivity to reach the benefits associated with the large and resource-diverse EDAM market,” the company said in an email to RTO Insider. 

At the same time, PNM didn’t have any major concerns with the Markets+ design, the company said, adding that the EDAM choice was based on customer benefits from a reliability and economic perspective.   

“Much of these benefits come from having diverse loads and resources spread over a large geography,” PNM said. 

Guiding Principles

PNM filed a letter with the New Mexico Public Regulation Commission on Nov. 8 sharing its decision to go with EDAM. The brief letter references a set of guiding principles the commission issued Oct. 31 for utilities to consider in selecting a day-ahead market. (See NM PRC Issues ‘Guiding Principles’ for Electricity Market Participation.) 

PNM said it made its day-ahead market decision after considering the commission’s principles, “including the comparative analysis of customer benefits, the efficiency of resource dispatch and the importance of robust stakeholder processes.” 

The utility plans to file a more detailed response on how EDAM satisfies the PRC’s guiding principles before signing implementation agreements with CAISO, the company said in an email. 

PacifiCorp in April became the first Western utility to fully commit to EDAM and sign an implementation agreement with CAISO. That was followed by NV Energy’s announcement in May that it plans to join EDAM. 

The Balancing Authority of Northern California, Idaho Power, Los Angeles Department of Water and Power, and Portland General Electric also have made commitments to EDAM. 

As for El Paso Electric, which participated in the Brattle study with PNM, the utility has said it hopes to make a day-ahead market decision by the third quarter of 2025. The study’s projected benefits for EPE are $19.1 million a year for EDAM, versus $9.1 million for Markets+. 

The company may ask Brattle for analysis of additional scenarios, which could include EPE and PNM choosing different markets. EPE is expected to present the results of those studies to the PRC. 

Large Consumers Vent Frustrations with NYISO’s Proposed SCR Changes

Tensions flared at the NYISO Installed Capacity Working Group meeting Nov. 4 over the ISO’s proposed changes to the special case resource (SCR) demand response program, which large energy consumers said will cause a mass exodus of participants.

“I think NYISO should know that part of the extreme frustration with this project is that we thought there was going to be actual engagement with the demand side; that there would be engagement with SCR participants,” said Mike Mager, speaking for Multiple Intervenors, a group of large industrial customers.

Mager said that he believed the vast majority of the changes proposed to the SCRs would be viewed unfavorably by the participants.

SCRs typically are large industrial consumers that have loads that can be reduced or turned off. In a report to FERC, NYISO said that from November 2023 to April 2024, the SCR market reduced load by about 1,300 MW statewide. Local behind-the-meter generators participating in the SCR program contributed an additional 100 MW. NYISO allows customers who qualify to participate in the Installed Capacity Market to be SCRs, receiving revenue for reducing their load at the ISO’s direction.

The ISO proposes to change how SCR performance and compensation are calculated. Currently they are based on the average coincident load (ACL), which is the average of the SCR’s highest 20 one-hour peak loads from the previous capability year. NYISO wants to change this to the “customer baseline load” (CBL), which uses data from the prior 30 calendar days and is based on the highest five consumption days of the past 10 prior to an SCR event.

NYISO’s market design report from 2023 estimated this would reduce the megawatt value of an SCR by 6% to 26% depending on the zone; in New York City, this would be about 26%. Michael Ferrari, a market design specialist for NYISO, said the changes more accurately would capture the performance of SCRs.

“The whole ACL/CBL change was not part of any type of engagement,” Mager said. “The testing proposal we’re going to get to is also new by the NYISO. The four-hour notices was also new by the NYISO. There was some discussion about the notice period during the engagement phase, but the feedback provided by the SCR participants was largely ignored.”

NYISO also wants to increase the duration of the performance test of an SCR to six hours, up from one. In prior meetings ISO staff also expressed a desire to increase the duration requirement of an SCR to six hours and shorten the notice window from 21 hours to four hours. (See Large Consumers Miffed at NYISO Proposal to Shorten SCR Notice Period.)

“This deal just kind of seems to be getting worse and worse,” said Aaron Breidenbaugh, senior director of regulatory and government affairs for CPower. “For a project that’s supposed to be coming out of ‘Engaging the Demand Side,’ I think a word besides ‘engaging’ is more appropriate.”

Mager said the changes were moving in the wrong direction, disincentivizing participation at a time when the state’s reliance on intermittent generation was increasing. Shutting down manufacturing for longer SCR testing, or on shorter notice for less compensation, was an overall bad deal for manufacturers, he said.

“The last time we talked about this, I used the Titanic analogy,” said Breidenbaugh. “Now we’ve just punched a hole in two more compartments.”

Breidenbaugh said if he was working at NYISO and had been given the job of eliminating the SCR program, he would do exactly what the ISO was proposing to do.

“If you’re trying to get rid of it, you’re doing a really good job, but I don’t think that’s what you’re trying to do,” he said. “I think everyone can believe that this could make a better program with more flexible megawatts. You’ll have more flexible resources; they will just be a tiny fraction of what you have.”

“I’ve not been given the request to kill the SCR program. That is not the intent of this series of proposals,” Ferrari said.

After some additional discussion, Breidenbaugh said he didn’t think New York state’s regulatory authorities would allow the amount of DR that is dependent on participating in the SCR program to go away. He said  if the changes caused participants to jettison from the program, the state might work with utilities to get its own program in place.

“I certainly don’t think it’s the best way for NYISO and its operators to lose control of those levers,” he said. “I’m not sure the utilities necessarily want to take on that responsibility, but they oftentimes get tasked with doing things they don’t want to do.”